Croatian Biogas Association, home page
3D view of a biogas upgrading unit and a bioLNG tank beside digesters at dusk

Biomethane

Biomethane is upgraded biogas of natural gas quality. It can go into the gas grid, into tanks as bioCNG, or be liquefied into bioLNG for heavy transport.

From biogas to biomethane

The same plants, the same digesters and the same feedstock can produce biomethane for the gas grid, bioCNG and bioLNG. That is why the Croatian Biogas Association (CBA) is leading the transition of existing plants and the development of new biomethane projects.

A biogas upgrading unit with three steel columns and a white bioLNG tank in front of the digesters

Converting existing plants

A biogas plant with four white-domed digesters, seen from the air

Most Croatian plants today generate electricity in combined heat and power units. With an upgrade, the same biogas production can be turned into biomethane, while the digesters, the feedstock and the operators’ experience stay.

  1. Plant assessment

    Quantity and composition of the biogas, distance from the pipeline, potential buyers and project economics.

  2. Upgrading technology

    Membrane separation, water scrubbing, PSA or amine scrubbing, depending on size and conditions.

  3. Permits and connection

    Permit amendments and a contract with the gas system operator, or an off-grid solution.

  4. Financing

    Own funds, EU funds, the support scheme for biomethane and guarantees of origin.

  5. Operation and sales

    Injection into the grid or sale as bioCNG and bioLNG, with the option of keeping part of the CHP capacity.

Connecting to the gas grid

Biomethane is injected into the distribution or transmission gas system and reaches consumers through the same pipes as natural gas. The key factors for connection are:

  • the plant’s distance from the pipeline and the grid pressure
  • gas quality, metering and odorisation
  • the system operator’s connection terms and costs
  • guarantees of origin and the incentive scheme for biomethane

Where biomethane ends up

Households and industry
heating, process heat
Transport
bioCNG and bioLNG filling stations
Power and heating plants
flexible generation
Chemical industry
replacing fossil gas

Off the grid: bioCNG and bioLNG

Plants far from a pipeline can compress or liquefy biomethane and take it to buyers by road.

Comparison of three routes for biomethane to reach the buyer
FeatureGas gridbioCNG (off-grid)bioLNG
Formgas at grid pressurecompressed gas in tanks, about 200 barliquefied gas at about −162 °C
Transportexisting pipelineslorries with tankscryogenic tankers
Useall gas usersvehicle fleets, local industryheavy lorries, ships
Suitable forplants near a pipelinesmaller, remote plantslarger volumes, pooling several plants

For investors

A biogas plant with green domes behind a green field

With the REPowerEU plan, the European Union is aiming for 35 billion m³ of biomethane a year by 2030. Croatia starts with an advantage: the plants are already running, the feedstock is there, and the operators have the experience.

Association contact details