Croatian Biogas Association, home page

About us

The Croatian Biogas Association has brought together operators of biogas plants since 2016. It represents the biogas and biomethane sector before institutions, the public and European partners.

A plain with maize and stubble fields, a row of poplars and the domes of a biogas plant

Mission

To secure stable conditions for the operation of biogas plants and the recognition of biogas and biomethane as key tools for decarbonising agriculture, the food industry and transport.

The biogas plant at Gregurovec from the air: three domed digesters, an office building and gathered visitors
The Bioplinara Organica Kalnik 1 plant, Gregurovec

Vision

The association’s vision is a Croatia in which every stream of organic waste from a farm or a kitchen is turned into renewable energy and returned to the soil as fertiliser.

Goal under the Statute

To promote, advance and encourage the development of, and research into, biogas production.

How the association pursues it

  • Courses, public forums, seminars and workshops
  • Cooperation between scientists and experts from the sector
  • Help in organising professional conferences
  • Technical reports, project documentation and feasibility studies
  • Professional publications on biogas and biomethane
  • Training and advice for members

Bodies and organisational structure

Term of office: 9 February 2023 – 9 February 2027

  1. Assembly

    all members of the association

    1. Marijan Cenger

      President

      1. Emil Guščić

        Deputy President

      2. Toni Raič

        Josip Puljko

        Dalibor Vrček

        Vice-Presidents

      3. Ante Topalović

        Secretary

Marijan Cenger

Marijan Cenger

President

An entrepreneur in agriculture and renewable energy from Grubišno Polje. He founded his family farm in 2005 and today farms more than 1,000 hectares of land.

He has worked with biogas since 2014, when he took over an unfinished project for a 1 MW biogas plant near Grubišno Polje, which he put into operation in 2016. Since 2018 he has produced the organic fertiliser ECODIG, and in 2025 he took over and restarted a 2 MW plant. His companies employ more than 100 people.

He has led the association since 2018. Over the past two years he has headed its work on moving plants from electricity generation to biomethane.

Emil Guščić

Emil Guščić

Deputy President

Ante Topalović

Ante Topalović

Secretary

A manager and entrepreneur from Bjelovar. Since 2021 he has been managing director of Bilogorska jaja and the owner of Smartie, a company that also advises on biogas. From 2018 to 2021 he ran the biogas business of Moslavina proizvodi.

He has served as Deputy Mayor of Bjelovar and as President of Bjelovar City Council. He studied at Josip Juraj Strossmayer University of Osijek.

Operators and plants

In the CBA table: 32 operators and 41 plants. Each operator is listed with its plants, their county and capacity.

  • Energija Gradec d.o.o.

    5 plants, 11.90 MW in total

    • Bioplinsko postrojenje GradecZagreb County2.38 MW
    • Bioplinsko postrojenje MitrovacOsijek-Baranja2.38 MW
    • Bioplinsko postrojenje PopovacOsijek-Baranja2.38 MW
    • Bioplinsko postrojenje OvčaraVukovar-Srijem2.38 MW
    • Bioplinsko postrojenje VinkaVukovar-Srijem2.38 MW
  • Osatina Grupa d.o.o.

    4 plants, 4.24 MW in total

    • Bioplinsko postrojenje TomašanciOsijek-Baranja1.06 MW
    • Bioplinsko postrojenje SlašćakOsijek-Baranja1.06 MW
    • Bioplinsko postrojenje Slašćak 2Osijek-Baranja1.06 MW
    • Bioplin IvankovoOsijek-Baranja1.06 MW

    osatina.hr

  • Moslavina Proizvodi d.o.o.

    2 plants, 2.14 MW in total

    • Bioplinsko postrojenje BojanaBjelovar-Bilogora1.07 MW
    • Bioplinsko postrojenje Bojana 2Bjelovar-Bilogora1.07 MW
  • VDM Energija d.o.o.

    2 plants, 2.10 MW in total

    • Bio postrojenje Donji MiholjacOsijek-Baranja1.05 MW
    • Bio postrojenje ViljevoOsijek-Baranja1.05 MW
  • Eco-Biogas d.o.o.

    • Bioplinsko postrojenje PisarovinaZagreb County3.54 MW
  • Osilovac d.o.o.

    • Bioplinsko postrojenje OsilovacOsijek-Baranja2.60 MW
  • Biointegra d.o.o.

    • Bioplinsko postrojenje SlatinaVirovitica-Podravina2.17 MW
  • Bioplinara Organica Kalnik 1 d.o.o.

    • BP GregurovecKoprivnica-Križevci2.10 MW
  • PMA Gaj d.o.o.

    • Bioplinsko postrojenje GajPožega-Slavonia2.00 MW
  • Farma muznih krava Orlovnjak d.o.o.

    • Bioplinsko postrojenje OrlovnjakOsijek-Baranja1.78 MW
  • Bioenergija Klisa d.o.o.

    • Bioplinsko postrojenje KlisaOsijek-Baranja1.50 MW
  • Agroproteinka-Energija d.o.o.

    • Postrojenje za proizvodnju bioplina i el. energijeCity of Zagreb1.13 MW
  • Farma muznih krava Mala Branjevina d.o.o.

    • Bioplinsko postrojenje Mala Branjevina 2Osijek-Baranja1.09 MW
  • Novi Agrar d.o.o.

    • Bioplinsko postrojenje Mala Branjevina 1Osijek-Baranja1.09 MW
  • Bioel d.o.o.

    • BPE BioelBjelovar-Bilogora1.07 MW
  • SLK Projekt d.o.o.

    • Bioplinsko postrojenje HercegovacBjelovar-Bilogora1.07 MW
  • Bovis d.o.o.

    • Bioplinsko postrojenje Ivankovo 2Vukovar-Srijem1.06 MW
  • Farma Tomašanci d.o.o.

    • Bioplinsko postrojenje Tomašanci 2Osijek-Baranja1.06 MW
  • Landia d.o.o.

    • Landia – GradinaVukovar-Srijem1.06 MW
  • Bioplin Proizvodnja d.o.o.

    • Bioplinsko postrojenje Slatina 1 MWVirovitica-Podravina1.05 MW
  • Bioplinska Elektrana Orehovec d.o.o.

    • Bioplinska elektrana OrehovecKoprivnica-Križevci1.05 MW
  • Bionardo Gunja d.o.o.

    • Bioplinska elektrana GunjaVukovar-Srijem1.00 MW
  • Bioplin Gudovac d.o.o.

    • Bioplinsko postrojenje GudovacBjelovar-Bilogora1.00 MW
  • Bioplin-Maks d.o.o.

    • Bioplin RovišćeBjelovar-Bilogora1.00 MW
  • BR Bioplin Crnac 1 d.o.o.

    • Elektrana na bioplin Crnac 1Virovitica-Podravina1.00 MW
  • Energana Cerna d.o.o.

    • Bioplinsko postrojenje CernaVukovar-Srijem1.00 MW
  • Matvej d.o.o.

    • Elektrana na bioplin MatvejKoprivnica-Križevci0.75 MW
  • Clip Bio Plus d.o.o.

    • Bioplinsko postrojenje ClipBioPlusVaraždin County0.59 MW
  • Miagro Energo d.o.o.

    • Bioplin KućanciOsijek-Baranja0.55 MW
  • MICO d.o.o.

    • Bioplinsko postrojenje VladislavciOsijek-Baranja0.37 MW
  • Vrček obrt

    • Bioplinsko postrojenje VrčekVaraždin County0.25 MW
  • Eko Kotor d.o.o.

    • Bioelektrana-energana Eko Kotor 1Međimurje0.11 MW

Source: Croatian Biogas Association (CBA), based on the 2023 list from the Ministry of Economy and Sustainable Development (MINGOR). The labels after the names are Croatian legal forms: d.o.o. is a limited liability company and obrt is a sole trade.

Table and map of the plantsMembership terms and application

Registered office and Statute

Registered office
Gudovac 1d, Gudovac, Croatia
OIB (Croatian identification number)
61646876512
Registration number
06001428
Date of registration
15 September 2016
Statute
Adopted on 9 February 2023, aligned with the Associations Act
Name in Croatian
Hrvatska udruga proizvođača bioplina (HUPB)

The association’s Statute has not been published on this site yet.

European cooperation

The association follows the work of European biogas associations and brings their experience to Croatia.